Sign-up NowSeamless co-ordination
The C-VAC system can be easily installed in new build or existing workshops
Our P602 qualified design team will work with you to assess your requirements and agree the layout. Installation typically takes 2-5 days depending on the size of the system and can be achieved with minimum disruption to the teaching environment. Discrete ductng can be concealed within the ceiling void. Following installation each system is commissioned in accordance with HSG 258 guidance and supplied with user manuals and log books.